Location:
1. Ranong comprehensive plan areas and connected areas
2. Ko Phayam community and connected areas
Client:
Department of Public Works and Town and Country Planning, Ministry of Interior
Field of Specialization:
Development and design of eight infrastructure systems
Type of Service:
Feasibility Study and Detailed Design of infrastructure
Scope of Service:
- Review of relevant study reports
- Determination and feasibility study of master plans in terms of physical, economic, social, environmental and public participation aspects
- Systematic development of infrastructure in line with people’s requirements and community use
- Operation of public relations and public participation
Service Period:
April 2017-June 2018
Project Cost:
At least 600 million baht
Project Description:
Development of eight infrastructure systems
1) Other support systems: 11 projects
2) Transport systems: nine projects
3) Consumption water systems: five projects
4) Drainage and flood control systems: six projects
5) River bank protection systems: four projects
6) Waste disposal systems: five projects
7) Wastewater collection and treatment systems: one project
8) Regional electricity and solar cell systems: three projects
Plans are divided into four stages: urgent, short-term, medium-term and long-term plans
According to the pre-feasibility study, there are 50 projects in eight systems.